Risk and the Limits of Certainty

Risk and the Limits of Certainty

By Himangi Ahuja

Read Time: 3 min

Risk and the Limits of Certainty

A philosophy student’s reflection on risk management in infrastructure projects.

One of the first things philosophy trains you to do is to ask the right questions. Very quickly, this develops into a sensitivity to the difference between what is known, what is assumed, and what is simply taken for granted in order to proceed. I’ve found that this habit maps closely onto how risk actually operates in large infrastructure projects.

Consider fallibilism, the idea that even well-justified beliefs may turn out to be false. In philosophy, this is not a cause for analysis paralysis but a reason for discipline. In projects, early assumptions about timelines, approvals, or coordination are often reasonable given the information available at the time. The problem begins when these assumptions lose their provisional status. Once embedded into schedules, contracts, or public commitments, they acquire an authority that far exceeds their evidential basis. Risk, at that point is created by overconfidence in beliefs that no longer have room to be wrong.

A related concern appears in David Hume’s problem of induction, which arises from his analysis of cause and effect. Hume argued that our expectation that the future will resemble the past is not grounded in reason, but in habit: we come to expect one event to follow another simply because they have done so before. Past conjunctions of events, on their own, give us no logical guarantee that the same patterns will persist.

Large projects lean heavily on this very inference. What worked before is expected to work again, even as scale, context, and constraints quietly shift. Experience is indispensable, but it is also local. When familiarity is mistaken for reliability, precedent begins to pose as certainty, and risk remains invisible until commitments have already hardened.

Philosophy also draws attention to a distinction that projects often blur: the difference between what is probable and what is certain. Plans frequently assume that certain conditions will hold without asking whether the project can survive if they do not. Risk management becomes sharper when the question is reversed, what must be true for this project to succeed, and which of those conditions are no longer negotiable once decisions are locked in.

This brings us to irreversibility. Some choices such as design freezes, contractual allocations, sequencing decisions, cannot be easily undone. When actions are irreversible, the cost of being wrong increases dramatically. A philosophically informed approach to risk does not attempt to eliminate uncertainty but insists that uncertainty be acknowledged before flexibility disappears.

Seen this way, risk management is not a defensive exercise. It is an epistemic one. It asks whether our confidence is proportionate to our knowledge, and whether our commitments reflect the limits of what we can reasonably claim to know. Large projects do not fail because uncertainty exists. They fail when uncertainty is treated as an inconvenience rather than a condition of action.